Laserfiche WebLink
PuThm mtb ?mjariates <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Thursday, MaN19109 Arrive Time: 2:00 PM <br />Depart Time: <br />Project Name: West Elk Refuse Pile <br />Expansion Weather: Clear <br />Project Number: M09011MT <br />Laboratory #1418 Temp: <br />Client: Mountain Coal Company Client Representative: Larry Gillenwater <br />General Contractor: West Elk Mine Supervisor: Larry Gillenwater <br />Specialty Contractor: West Elk Mine Specialty Superintendent or Foreman: Larry Gillenwater <br />Source of Fill Material: Plans and Specs: N/A <br />Prepared by: Dated: <br />Contractor's Equipment Used: Dozers, loaders, excavators and vibratory sheepsfoot compactor <br />Lambert and Associates Equipment Used - Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On-Site to: Moisture content samples were obtained. <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed: No <br />If yes, who was contacted? <br />Follow-up from Prior Visit: Retests Performed: <br />Concerns for Next Visit: Retests Needed: <br />Other personnel contacted on-site: name/firm <br />Notes: <br />I performed nuclear field density tests, as requested by Larry Gillenwater with West Elk Mine, of material being placed <br />at the Refuse Pile Expansion. Please refer to the test results sheets for approximate test locations and test results. <br />The test results indicate only the relative compaction and soil moisture content of the material tested at the elevation <br />and location tested at the time of our site visit. <br />Lambert and Associates Technician: Hayes