Laserfiche WebLink
Lambert and Associates <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Friday, Jan/23109 Arrive Time: 10:00 AM <br />Depart Time: <br />Project Name: West Elk Refuse Pile Weather: Overcast, Raining <br />Project Number: M09011MT Temp: <br />Client: Mountain Coal Company Client Representative: <br />General Contractor: Supervisor: <br />Specialty Contractor: West Elk Mine Specialty Superintendent or Foreman: Henry Barbe <br />Source of Fill Material: West Elk Mine Plans and Specs: N/A <br />Prepared by: Dated: <br />Contractor's Equipment Used: Dozer, loader and sheepsfoot compactor <br />Lambert and Associates Equipment Used - Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On-Site to: Proctor sample was obtained <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed: No <br />If yes, who was contacted? <br />Follow-up from Prior Visit: Proctor sample was obtained Retests Performed: <br />Concerns for Next Visit: Proctor sample was obtained Retests Needed: <br />Other personnel contacted on-site: name/firm <br />Notes: <br />/ performed nuclear field density tests, as requested by Henry Barbe with West Elk Mine, of material being placed at the <br />RPE. Please refer to the test results sheets for approximate test locations and test results. The test results indicate only the <br />relative compaction and soil moisture content of the material tested at the elevation and location tested at the time of our site <br />visit. <br />Lambert and Associates Technician: Hayes