Laserfiche WebLink
?Jert aub PZsvriafez <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT - FIELD DENSITY TESTS <br />Date: Thursday, Feb15109 Arrive Time: 10:00 AM <br />Depart Time: <br />Project Name: West Elk Refuse Pile <br />Expansion Weather: Clear, Breezy <br />Project Number: M09011MT Temp: <br />Client: Mountain Coal Company Client Representative: Henry Barbe <br />General Contractor: West Elk Mine Supervisor: Henry Barbe <br />Specialty Contractor: Specialty Superintendent or Foreman: <br />Source of Fill Material: Plans and Specs: N/A <br />Prepared by: Dated: <br />Contractor's Equipment Used: Dozer, loader and sheepsfoot compactor <br />Lambert and Associates Equipment Used - Manufacturer: CPN Serial Number or Unit Number: 18 <br />Test Results were Verbally Given On-Site to: Proctor sample was obtained <br />Expected Conditions Observed: Yes <br />Unexpected Conditions Observed: No <br />Unusual Conditions Observed: No <br />If yes, who was contacted? <br />Follow-up from Prior Visit: Proctor sample was obtained Retests Performed: <br />Concerns for Next Visit: Proctor sample was obtained Retests Needed: <br />Other personnel contacted on-site: namelfirm <br />Notes: <br />I performed nuclear field density tests, as requested by Henry Barbe with West Elk Mine, of material being placed at <br />the RPE. Please refer to the test results sheets for approximate test locations and test results. The test results <br />indicate only the relative compaction and soil moisture content of the material tested at the elevation and location <br />tested at the time of our site visit. <br />Lambert and Associates Technician: Hayes <br />