Laserfiche WebLink
Topsoil Replacement and Reve etg ation <br />Topsoil replacement (750cy - road, 12,800 cy - pads) - 13,550 cy @ $0.80/cy $10,840 <br />Revegetation - 5.6 ac x $285.64/ac 1,600 <br />Subtotal $12,440 <br />Subtotal - Direct Costs $138,810 <br />Indirect and Administrative Costs (8%) 11,104 <br />Proiect Total Cost $149,914 <br />Notes: Dimensions from Figure EX49R-F2 <br />Costs from Means Site Work and Landscape Cost Data <br />TR09-66 04/07/09