Laserfiche WebLink
C-1981-022 <br />RN-05 Findings <br />February 2009 <br />Nineteen Technical Revisions (TRs) <br />• TR-43, approved on October 10, 2003, added the II West Coal Refuse Facility, which succeeded <br />the West Valley Coal Refuse Facility. <br />• TR-44, approved on November 21, 2003, added Petroleum Storage and an Equipment Wash Bay <br />to the Elk Creek facilities. <br />• TR-45, approved on March 17, 2004, updated miscellaneous information regarding hydrology, <br />adjacent ownership, contact person, and other permitting data. <br />• TR-46, approved July 6, 2004, added four new Gob Vent Boreholes, including the construction <br />of light use roads and pad sites. <br />• TR-47, approved October 8, 2004, allowed the transfer of underground mine sump water from <br />the active Elk Creek Mine D-Seam workings down to the former Somerset Mine C-Seam mine <br />workings for permanent storage. <br />• TR-48, approved November 3, 2004, added one new Methane Vent Borehole and associated light <br />use road. <br />• TR-49, approved on March 1, 2005, added the Hubbard Creek Fansite facility, including fan, <br />borehole, substation, and sedimentation Pond F. <br />• TR-50, approved on June 30, 2005, updated the Mine Plan map, incorporated as-built drawings <br />for the mine water transfer, and updated various environmental permits. <br />• TR-51, approved September 16, 2005, allowed the construction of two new boreholes at the <br />Hubbard Creek Fansite for the purpose of pumping accumulated mine water from the D-Seam <br />workings into the abandoned B-Seam workings. <br />• TR-52, approved July 21, 2005, incorporated the Hubbard Creek Fansite as-built drawings into <br />the permit. <br />•- TR-53, approved September 30, 2005, added fifteen new Methane Vent Boreholes, pads and <br />associated light use roads. <br />• TR-54, approved on June 9, 2006, added eleven new Methane Vent Boreholes, pads and <br />associated light use roads. <br />• TR-55, approved on May 14, 2007, provided for an Elk Creek Mine Plan change associated with <br />a 190.67-acre modification to Federal Coal Lease COC 61357. <br />• TR-56, approved on June 29, 2007, added four new Methane Vent Boreholes, pads and <br />associated light use roads. <br />• TR-57, approved on July 26, 2007, added two Methane Vent Boreholes, pads and associated <br />light use roads. <br />• TR-58, approved on March 11, 2008, added two new Methane Vent Boreholes, pads and <br />associated light use roads. <br />• TR-59, approved on December 10, 2008, provided for a mine plan change to add additional coal <br />reserves (148 acres) contained in the Tract #4 modification to Federal Coal Lease C-61357. The <br />148-acre increase in affected area resulted in an increase of 249.08 acres to the permit area, <br />• TR-60, approved January 7, 2009, added the Bear Creek Fansite Facility, which includes a fan <br />shaft (raised borehole development); fan assembly (relocated from the Substation No. 3 site); and <br />a substation (relocated from the Hubbard Creek Facility). <br />11