Laserfiche WebLink
INTEROFFICE MEMORANDUM <br />TO. TOM KALDENBAGEI <br />FROM: JANET BINNS <br />SUBJECT: MARRMINE, 1981-00 008 AL ROLOGYREPORT <br />DATE: 4/13/2009 <br />CC: DAN HERNANDEZ <br />I am requesting assistance with review of Kerr Coal Company's submittal of the 2008 Annual Hydrology <br />Report, in accordance with Rule 4.04.13(4). The 2008 AHR for the Marr Mine and Loadout was received <br />March 31, 2009. This report was submitted as a stand alone report and not as a part of a technical revision. <br />The mine is a reclaimed surface mine along with a mostly reclaimed load out facility located 12 miles away from <br />the mine. All but 8 acres at the mine site were approved for final (phase III) bond release in January 2009. <br />Water monitoring wells at the mine location were sealed in 2008. All remaining ponds at the mine site (A, B, D, <br />E, & F) were approved to remain as permanent ponds. The Loadout pond has not been approved to remain as <br />a permanent structure at this time, nor has it been reclaimed. Subsurface water monitoring wells are still <br />functional at the Loadout facility. Thank you for your help in this review.