Laserfiche WebLink
<br />C-1981-022 <br />RN-05 Findings <br />February 2009 <br />X. Subsidence Control <br />The permit area includes three different mines which have been active through the term of <br />the permit to date: the Somerset Mine, the Sanborn Creek Mine, and the Elk Creek Mine. <br />These underlie different areas and, therefore, have had separate requirements for subsidence <br />monitoring and control. <br />The applicant used a subsidence control plan in accordance with Rule 2.05.6(6) and <br />committed to adopt all measures in order to reduce the likelihood of subsidence and prevent <br />material damage to Hubbard Creek, which was undermined by the Somerset Mine. The <br />Division approved the plan (4.20.1(2) and 4.20.3(1)). There were no structures within the <br />area affected by the Sanborn Creek Tract subsidence. However, there are several landslide <br />features above the proposed underground workings and Oxbow Mining, LLC committed to <br />monitor these features. To date, no impacts have been noted. <br />The applicant conducted a subsidence monitoring program during the period the Sanborn <br />Creek Mine has been active, in accordance with Rule 2.05.6(6)(c), designed to determine the <br />commencement and magnitude of subsidence movements. The results of the monitoring <br />program were submitted to the Division annually. The monitoring program was designed to <br />extend for a time, beyond cessation of mining in any area, consistent with the need for <br />verification of the subsidence prediction. <br />For the Elk Creek Mine, the applicant conducted an inventory of "all structures and <br />renewable resource lands which exist within the proposed permit and adjacent area" as <br />required by Rule 2.05.6(6)(a). The determination was that no such structures or features <br />exist within the area to be undermined by the Elk Creek activity. Therefore, no further action <br />was required. The operator, though, submitted a subsidence evaluation for the area, which <br />can be found in Volume 12 of the permit, Exhibit 2.05-E8. <br />In response to a stipulation on the federal coal lease, OMLLC conducted a reassessment of <br />the hydrologic resources of the Elk Creek coal lease and an assessment of potential future <br />monitoring needs for "high value" hydrologic resources. The report was produced in <br />November 2003, and the BLM agreed to the findings of the hydrologic reassessment in <br />January 2004. Also in January 2004, OMLLC further summarized the record of <br />correspondence and field work for incorporation into the water replacement plan. These <br />documents and pertinent maps were submitted to the Division under TR-45, which was <br />subsequently approved in March 2004. <br />XI. Operations on Alluvial Valley Floors <br />1. The Division has determined that an alluvial valley floor exists in an adjacent area. <br />29