Laserfiche WebLink
<br />Project: ............................. .............. .. ............. ... <br />• • <br />GEOTECH Client / On Site Rep: <br />Bowie Resources / B. Bear <br /> <br />Bowie Mine Gob Pile Stability . <br />...................................... ... -::-:::- ......:::::_-::: --: <br />.. Civil, Structural & Geotechnical•Engineers <br />Co 81401 <br />• M <br />t <br />Contractor / Rep: <br />Load Out Services / Ty Hyatt <br /> rose, <br />on <br />222 South Park Ave. <br />Project No: Date: <br />2005126-CMT 1/12/2009 Ph.: (970) 249-6828 • FAX: (970) 249-0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />L. Sanchez <br /> DAILY CO MPACTION REPORT <br /> TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />TEST MB <br /> <br />NUMBER LOCATION <br /> <br />Gob Pile No. 2 - Embankment GRADE F1EV <br />NUC <br />SAND DENSITY <br /> <br />(pcf) MOISTURE <br /> <br />CONT. (%) DENSITY <br /> <br />(per CONTENT <br /> <br />(%) COMPACTION wRHIN <br /> <br />SPEC TYPE NUMBER <br />228 <br />229 (PT#4362) N 19388630/E37567.32 <br />(PT#4363) N19424.37/E37458.83 .6093.3 <br />6094.8 X <br />X 99.0 <br />101.0 9.9 <br />9.3 88.7 <br />91.0 11.1 <br />13.9 <br />10 <br />3 90.0 <br />90.1 <br />1 <br />91 gob <br />gob <br />ob/cl #228 & #229 r/c 021% <br />#228 & #229 ric @28% <br />#230 r/c @24% <br />230 (PT#4364 N19408.33/E37314.07 6097.7 X 106.6 9.4 97.1 . . g <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS <br /> <br />Specified <br />Compaction Cohesive Soils X <br />Requirement: 900/0 + Cohesionless Soils OBSERVATION / TESTING <br /> <br /> <br />Full Time: <br /> <br />Part Time: FIELD OBSERVATION <br />Date: <br /> <br />Day: 5 M T W Th F S <br />X <br />Weather: Sun Clear Overcast Rain Snow <br />X X X S <br />Compaction Equipment Used: <br /> <br /> <br />Sheepsfoot: <br /> <br />oth Drum Roller: <br />S <br /> mo <br />Specified <br />Moisture N/A Cohesive Soils X <br />irement: C <br />less Soils <br />R <br />i <br />h <br />Number of Site Visits/Day: <br />Temp: <br />To 32 <br />x <br />32-50 <br />X <br />50-70 <br />70-85 <br />8S Up <br /> <br />Vibratory: <br />equ <br />es <br />on <br />o Testing Only: 17-7-1 Wind: Still Mod <br />X High <br />Other (List Below): <br />Laboratory Testing ASTM-698 Cohesive Soils X <br />Procedure: <br />Cohesionless Soils Requested By (Company Name): <br />Ty Hyatt / Load Out Services Humidity: X <br />Dry <br />X Mod Humid Haul Traffic <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br /> <br />ON THIS DATE FOR THE FOLLOWING REASONS: Insufficient amount <br /> <br />of material placed. Informed (Rep of Company) of Test Results: <br /> <br />Ty Hyatt /Load Out Services <br />Buckhorn was not informed prior <br />to our arrival on site that the <br />T <br />D The Contractor Is: contractor would not be working <br />ue <br />o: <br />Contractor Not Working <br />Inclement Weather: <br />Processing Frozen Material ?Processing Wet Material: <br /> <br />Mat9: <br />Dr <br />i <br />di <br />i Field Copies Given To: <br /> <br />Contractor: <br />Client: on this date. <br />Equipment Malfunction: <br /> <br />Unknown: y <br />on <br />ng <br />t <br />Stripping and/or Grubbing: Moisture Con <br />Stockpiling Fill: Removing Unsuitable Mafl: <br />CM/GM: <br /> <br />Other: PAGE 1 OF 1 <br />OS-126-CMT Bowie Mine Gob Pile Stability.xis DCR1-12-0910228-ap