My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-10_REPORT - C1996083 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2009-04-10_REPORT - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:27 PM
Creation date
4/10/2009 2:22:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REPORT
Doc Date
4/10/2009
Doc Name
1st Quarter 2009 Gob Pile Stability Report
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
JJD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: ...........................,...r.......... .......................... <br />.4 n GEOTO .: Client / On Site Rep: <br />Bowie Resources / B. Bear <br />Bowie Mine Gob Pile Stability WCivil, Structural y&XGeotechnical Engineers <br />CO 81401 <br />222 South Park Ave. • Montrose Contractor / Rep: <br />Load Out Services / Ty Hyatt <br />Project No: <br />2005126-CMT Date <br />3/30/2009 , <br />Ph.: (970)249-8828 • FAX: (970) 249-0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />L. Sanchez <br /> DAILY CO MPACTION REPORT <br /> TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />TEST <br />NUMBER LOCATION <br />Embankment Gob - Gob Pile No. 2, Slope Embankment GRADE ELEV NUC SAND DENSITY <br />(pCf) MOISTURE <br />CONT. (%) DENSITY <br />(pcf) CONTENT <br />(%) CoMPACION WITHIN <br />SPEC TYPE NUMBER <br />254 <br />255 (PT#4389 N19497.90/E37654.91 <br />PT#4390) N19457.27/E37455.94 6108.8 <br />6110.3 X <br />X 98.1 <br />96.0 9.9 <br />10.6 96.4 <br />95.4 14.3 <br />13.3 98.3 <br />99.4 gob <br />gob #228 & 229 r/c 0 18% <br />#228 & 229 r/c @ 11 <br />256 PT#4391) N19418.07/E37304.55 6108.3 X 96.2 10.7 92.2 14.6 95.8 gob #228 & 229 roc 0 12- <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION / TESTING FIELD OBSERVATIONS <br />d <br />ifi <br />S Date: Compaction Equipment Used: <br />pec <br />e <br />Compaction 90% + Cohesive Soils X <br />Requirement: Cohesionless Soils Full Time: Day; 5 M <br />X T W Th F S <br />Sheepsfoot: <br /> Part Time: Weather: Sun Clear Overcast Rain Snow <br />d <br />fi x X X Smooth Drum Roller: <br />e <br />Speci <br />Moisture N/A Cohesive Soils X <br />Requirement: Cohesionless Soils Number of Site Visits/Day: Temp: To 32 32-50 <br />X 50-70 70-85 85 Up <br />Vibratory: <br /> Testing Only: Ell Wind; Still Mod High <br /> Requested By (Company Name): X X Other (List Below): <br />Laboratory Testing ASTM-698 Cohesive Soils X <br /> <br />Procedure: <br />Cohesionless Soils Ty Hyatt / Load Out Services Humidity: Dry <br /> <br />X <br />I Mod "MI <br />Haul Traffic <br />- <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: Insufficient amount <br />lof material placed. Informed (Rep of Company) of Test Results: <br />Ty Hyatt /Load Out Services <br />Bu was not informed prior <br />to o our arrival on site that the <br />Contractor Not Working Due To; The Contractor Is: contractor would not be working <br /> <br />Inclement Weather: <br />Processing Frozen Material: =Processing Wet Material: <br /> <br />=Moisture Conditioning Dry MatT <br />nd/or Grubbing: <br />St <br />i <br />i Field Copies Given To: <br /> <br />Contractor: <br />Client: on this date. <br />Equipment Malfunction: <br />Unknown: _ <br />ng a <br />r <br />pp <br />Stockpiling RII: =Removing Unsuitable Mafl: CM/GM: <br />Other PAGE 1 OF 1 <br />05-126-CMT 13ovvie Mine Gob Pile Stability.xis DCR3-30-091s#254-aa
The URL can be used to link to this page
Your browser does not support the video tag.