Laserfiche WebLink
Project: ............... .......------ .... .................... ........ <br /> <br />' GE4TECH <br />Client / On Site Rep: <br />Bowie Resources / B. Bear <br /> <br />Bowie Mine Gob Pile Stability ............. ......................................................... <br />...... Civii, Structural & Geotechnicai Engineers <br /> <br />O 81401 <br />Contractor / Rep: <br />/ <br />Load Out Services Ty Hyatt <br />Project No: <br />2005126-CMT Date: <br />1/6/2009 222 South Park Ave. • Montrose, C <br />Ph.: (970) 249-6828 • FAX: (970) 249-0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />L. Sanchez <br /> DAILY CO MPACTION REPORT <br /> TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NQT SOIL LAB SAMPLE <br />?? <br />NUMBER LOCATION <br /> <br />Gob Pile No. 2 -Embankment GRADE ELEV <br />NUC <br />SAND DENSITY <br /> <br />(pcf) MOISTURE <br /> <br />CONT. (%) DENSITY <br /> <br />(pcf) CONTENT <br /> <br />(%) COMPACTION WITHIN <br /> <br />SPEC TYPE NUMBER <br />225 (PT#4359) N19428.29/E37441.25 6097.0 X 108.9 12.0 99.4 16.5 91.3 gob #225 & #226 r/c 017% <br />226 <br />227 (PT#4360) N19409.37/E37248.66 <br />(PT#4361) N19384.66/E37562.60 6096.6 <br />6091.8 X <br />X 113.4 <br />107.8 10.9 <br />10.2 103.0 <br />104.9 16.5 <br />13.6 90.4 <br />97.3 gob <br />gob #225&#226r/c@33% <br />#227 r/c @23% <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION / TESTING FIELD OBSERVATIONS <br /> Date: Compaction Equipment Used: <br />Specified <br />Compaction Cohesive Soils X <br />Requirement: 90%+ <br />Cohesionless Soils Full Time: Day: <br /> <br />5 M T <br /> <br />X W Th F S <br /> <br />Sheepsfoot: IF 'A <br /> Part Time: Weather: Sun Clear Overcast Rain Snow <br /> X X Smooth Drum Roller: <br />Specified <br />Moisture N/A Cohesive Soils X <br />Requirement: Cohesionless Soils Number of Site Visits/Day: Temp: To 32 32-50 <br />X 50-70 70-85 85 Up <br />Vibratory: <br /> Testing Only: Wind: Still Mod High <br /> Requested By (Company Name): X Other (List Below): <br />Laboratory Testing ASTM-698 Cohesive Soils X <br />Procedure: <br />Cohesionless Soils Ty Hyatt / Load Out Services Humidity: Dry <br />X Mod Humid Haul Traffic <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br /> <br />ON THIS DATE FOR THE FOLLOWING REASONS: Insufficient amount <br /> <br />lof material placed. Informed (Rep of Company) of Test Results: <br /> <br />Ty Hyatt /Load Out Services <br />Buckhorn was not informed prior <br />to our arrival on site that the <br />actor Not Working Due To: <br />t <br />C The Contractor Is: contractor would not be working <br />on <br />r <br />Inclement Weather: <br />Processing Frozen Material: Processing Wet Material: <br /> <br />=Moisture Conditioning Dry MaYI: <br />bbi Field Copies Given To: <br /> <br />Contractor: <br />Client: on this date. <br />Equipment Malfunction: <br />Unknown: ng: <br />stripping and/or Gru <br />Stockpiling Fill: =Removing Unsuitable Mafl: CM/GM: <br />Other: PAGE 1 OF 1 <br />05-126-CMT Bowie Mine Gob Pile Stability.As DCRl-6-091s#225-ap