My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-10_HYDROLOGY - C1981041
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981041
>
2009-04-10_HYDROLOGY - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:26 PM
Creation date
4/10/2009 2:12:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
HYDROLOGY
Doc Date
4/10/2009
Doc Name
2009 Annual Impoundment Inspection
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Prof Pond Certifications
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The north decline east and west non-discharging sumps are designed to contain <br />the 25-year 24 hour storm event without discharge. The sumps were dry during the <br />inspection. The sumps were certified by Larry M. Reschke, P.E. on December 21, <br />1992. Based on visual observations during the inspection and a hand level survey of <br />the depth of the sumps, the sumps have excess capacity plus the following design <br />capacity: <br /> Water Sediment Total <br />East Sump - A-F 0.08 N/A 0.08 <br />West Sump - A-F 0.32 N/A 0.32 <br />The sewage lagoons located at the unit train loadout consist of an aeration lagoon and <br />a series of three non-discharging lagoons. During the inspection, the lagoons were dry. <br />The capacity of the lagoons is not considered important and is therefore not presented. <br />The lagoons are inactive. The embankment on all of the lagoons needs to be graded to <br />smooth out erosional features. Plans are to delay maintenance of the embankments <br />until the sewage lagoons have been re-activated. Reclamation will likely occur before <br />the system is activated. <br />To the best of my knowledge and belief, the impoundments with the exception of the <br />as designed and in accordance with the <br />sewage lagoons, have been ma'jptai <br />approved plan and applicab la?j, ? <br />E. Sl0 ;? <br />Q- <br />a.• Date <br />s E. Stove 1`01' <br />Color l2. ProfessionigMaineer <br />i*onNa_," DSO <br />V/0NAL 00 <br />10 414 ?_6' - <br />-4-
The URL can be used to link to this page
Your browser does not support the video tag.