Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Colorado Division Of Reclamation Mining And Safety <br />02b State : Colorado Permit/job #: M-1983-067 <br />04/01/2009 <br />JLE <br />Abbreviation :none <br />Filename : M067-02b <br />Permit or other job action : Succession Of Operator <br />Task description : Spreading topsoil on western half of disturbed area <br />........... <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />uipment Description <br />Scraper work team -Scraper : Cat 627G <br />-Push dozer : Cat D8R Series N - 8SU (2005) <br />Support equipment -Load area <br />Cost Bre <br />-Dump area <br />Road maintenance -Motor grader : CAT 12H <br />-Water truck : Water Tanker, 2,500 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA NA grader misctruk <br />% Utilization-machine : 100 84 NA NA 100 100 <br />-Ripper attachment : NA 0 NA NA 10 NA <br />Ownerhip cost/hour : $55.31 $50.32 NA NA $20.87 $7.53 <br />Operating cost/hour : $125.95 $64.79 NA NA $31.04 $15.44 <br />Ripper op. cost/hour : NA $0.00 NA NA $0.00 $0.00 <br />Operator cost/hour : $32.96 $32.78 NA NA $33.15 $33.94 <br />Unit subtotals : $214.22 $147.88 NA NA $85.06 $56.91 <br />Number of units : 2 1 0 0 1 1 <br />Group subtotals : Work : $576.33 Support : $0.00 Maintenance : $141.97 <br />Total work team cost/hour : $718.29 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 12,100 LCY <br />factor : NA volume : 12,100 LCY <br />Source of quantity take-off :Amendment 01 Application <br />Source of estimated swell factor :NA <br />County :Adams <br />Site : Stagecoach Pit