Laserfiche WebLink
Table 1-1 <br /> Hydrology Monitoring Requirements - Lorencito Canyon Mine <br /> Status During Final Reclamation <br /> Water Level Field Analytical <br />Site or Flow Measurement* List' <br />Surface Water <br />JC-1 S S A <br />LCA S S A <br />LC-2 S S A <br />PC-1 Terminated <br />PRGTY-1 S S A <br />PRGTY-2 S S A <br />Springs <br />PJC-1 Inactive <br />Ponds <br />PJC-1 Terminated <br />Alluvial Wells <br />MWJC-1 S S A <br />MWLC-1 S S A <br />MWLC-2 S S A <br />MWPC-1 Terminated <br />• MWLO-W (Destroyed 4/2005) <br />MWLO-E Terminated <br />KEY: Q = Quarterly (February, May, 'See Table 1-2 for parameters included <br /> August, November) in each suite. <br />S = Semi-Annually (May, November) <br />A = Annually (November) <br />C] <br />2 (Revised 2009)