My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-09_REPORT - C1996084
>
Day Forward
>
Report
>
Coal
>
C1996084
>
2009-04-09_REPORT - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:25 PM
Creation date
4/9/2009 2:48:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
REPORT
Doc Date
4/9/2009
Doc Name
2008 Annual Hydrology Report
From
Peak Project Management, LLC
To
DRMS
Annual Report Year
2008
Permit Index Doc Type
Hydrology Report
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:. moderate salinity, pH ranges from 7.4 to 8.7, and hardness ranges from 107 mg/L to <br />435 mg/L. Total dissolved solids in the samples ranged from 210 - 980 mg/1 <br />(filterable residue). An increase in TDS of 10 mg/L has been noted between the <br />upstream and downstream stations on the Purgatoire River, likely due to higher TDS <br />discharges from coal bed methane activities in Lorencito Canyon. <br />Spring and Seep Stations <br />Water quality sampling during the baseline period revealed slightly to moderately <br />alkaline, slightly hard, calcium-sodium bicarbonate water, with total dissolved solids <br />ranging from 300 mg/L to 710 mg/L. Total alkalinity in the samples ranged from <br />223 mg/L to 409 mg/L, and hardness ranged (as CaCO3) from 214 mg/L to 388 <br />mg/L. pH ranged from 6.70 to 9.15. <br />Monitoring of spring SPJC-1 was terminated in 2007. Discharge from CBM Wells <br />greatly exceeded flow from the spring, intermingling with the flow and masking <br />sample results for the spring's flow rate and quality. <br />0 <br />Pond Sites <br />In addition to the springs, seeps, and streams, ponds are also present on the site. <br />These ponds are utilized to provide water for livestock and wildlife. A total of <br />nineteen ponds were located by ground and aerial surveying methods (Map 2.04.7- <br />1). A large number of these ponds (eight) are located in the Cow Canyon drainage. <br />The other ponds are scattered over the site, with generally no more than two in any <br />drainage. All ponds located appear to be artificial, with man-made dams at one end. <br />Water level in the ponds varies from season to season depending on runoff received <br />in the drainages and from CBM wells; however, all ponds consistently hold water. <br />Monitoring of pond (PJC-1) was terminated at the end of 2006. <br />Sediment control ponds 5, 6, 7, 8, 9A and 9B and 10 have been constructed to treat <br />disturbed area runoff. Discharge from Ponds 8, and 9B occurred during the third <br />quarter of 2008. Quarterly Discharge Monitoring Reports (DMRs) have been filed <br />with the Colorado Department of Public Health and the Environment with copies to <br />the Division. <br />• <br />8
The URL can be used to link to this page
Your browser does not support the video tag.