Laserfiche WebLink
CAM Mining LLC <br />MUNGER CANYON MINE <br />IMPOUNDMENT YEARLY INSPECTION <br />In accordance with Rule 4.05.9(14), all impoundments shall be inspected at least yearly <br />to determine if the impoundment has been maintained as designed, and in accordance <br />with the approved plan and the applicable regulations. This yearly inspection is for the <br />impoundment located at the Munger Canyon Mine. <br />On April 6, 2009, 1 performed the required yearly inspection. I, J. E. Stover, have a <br />wide variety of experience in the design and construction of earth fill embankments. <br />Nothing was observed during the inspection that would indicate the pond has a <br />potential for failure. There was no appearance of erosion, instability, structural <br />weakness o"r otherTiazardous con i ions. There are no required monitoring procedures <br />or instrumentation other than quarterly and yearly inspections. There are no aspects <br />which might affect stability. The pond/impoundment was not discharging during the <br />inspection. <br />The pond was dry. <br />POND CAPACITY - ACRE FEET <br />Water Sediment Total <br />0.41 0.19 0.60 <br />To the best of my knowledge and belie*ou?ndment at the Munger Canyon Mine <br />has been maintained as designed ar???? Sf'rwith the approved plan and <br />applicable regulations. ao???,s <br />??tS .0230 ga <br />L4 .,1.p at <br />James E. S @er Date <br />Colorado Professi <br />Registration No. 19230