Laserfiche WebLink
., <br />TABLE 1 01 <br />JANUARY (09) <br />FEBRUARY (09) <br />MARCH (09) <br />APRIL (09) <br />MAY (09) <br />JUNE (09) <br />JULY (09) <br />AUGUST (09) <br />SEPEMBER (09) <br />OCTOBER (09) <br />NOVEMBER (09) <br />DECEMBER (09) <br />TOTAL <br /> <br /> <br /> <br />URFACE <br />AREA <br />(ACRES) <br /> <br />MONTHLY <br />NET <br />EVAPORATION <br />(AF) TOTAL LAGGED <br />EVAPORATIVE <br />LOSSES <br />AT THE TWO RIVERS <br />PIT SITE <br />(AF) <br />REPLACEMENT <br />PROVIDED <br />BY THE TOWN <br />OF MILLIKEN <br />(AF) <br />(1) (2) (3) (4) <br />1.50 0.11 0.15 0.44 <br />1.50 0.15 0.15 0.41 <br />1.50 0.18 0.18 0.55 <br />1.50 0.30 0.22 0.65 <br />1.50 0.40 0.29 0.86 <br />1.50 0.58 0.39 1.03 <br />1.50 0.64 0.48 1.32 <br />1.50 0.59 0.50 1.37 <br />1.50 0.41 0.43 1.22 <br />1.50 0.27 0.34 1.14 <br />1.50 0.13 0.24 0.84 <br />1.50 0.11 0.18 0.74 <br /> 3.87 3.55 10.57 <br />(1) Surface Area to be Exposed at the Two Rivers Pit <br />(2) Monthly Net Evaporation at the Two Rivers Pit based on a net evaporation rate of 2.6 acre-feet/acre <br />(3) Total Lagged Evaporative Losses at the Two Rivers Pit (lagged using an SDF of 20 days) <br />(4) Replacement provided by the Town of Milliken Lease <br />Two Rivers Pit Monthly Distribution and Replacements (09)