Laserfiche WebLink
PRELIMINA PAGE 10 <br />PROPOSED RIG & EQUIPMEN <br />VERTICAL EXPLORATION & MONI <br />1012512007 <br />MM BITHELL <br />CORE INTERVAL 988 FEET <br /> <br />EQUIPMENT QUANTITY <br />DRILL RIG MOBILIZATION <br />SET-UP RIG & --EQUIPMENT ON LOCATION 1 <br />PER DIEM FOR CREW 2 <br />SURFACE CASING <br />DRILL 14 314" HOLE 8 <br />RUN 80' OF 10 3/4" CASING 3 <br />CEMENT SURFACE CASING 3 <br />WAIT OF CEMENT & CONNECT FLOW HEAD 9 <br />PER DIEM FOR CREW 2 <br />DRILL VERTICAL EXPLORA_TI.ON_ WELL TO CASING/CORE POINT <br />DRILL 6_3/_4" OH_ 88 <br />PER DIEM FOR CREW 4 <br />POOH & LAY DOWN 6 <br />RUN 7" CASING _ <br />RIG-UP TO RUN CASING <br />3 <br />RUN 4 112" CASING 6 <br />RIG UP TO CEMENT 4 <br />PER DIEM FOR CREW 2 <br />CEMENT BOTTOM TO TOP 5 <br />POOH & LAY DOWN TRIMMIE 3 <br />TOP OFF CEMENT 3 <br />CORE DRILL 3 3/4" BARREL - 1880.6 TO 2868.9 FT 988.3 FT <br />RIH W/ CORE BBL 4 <br />PER DIEM FOR CREW 12 <br />CORE DRILL 3 3W' OPEN HOLE 288 <br />POOH & LAY DOWN 4 <br />CEMENT BACK TO CASING POINT <br />- - - -- ------- <br />RIH W/ TRIMMIE PIPE 3 <br />PUMP CEMENT AND PULLOUT <br />PER DIEM FOR CREW 8 <br />2 <br />POOH & LAY DOWN_ 6 <br />TOP OFF WELL W/ CEMENT 3 <br />DRILL RIG DEMOBILIZATION <br />MOVE OFF LOCATION 1 <br /> <br />TRAILER HOUSE FOR CONSULTANT 15 <br />DRILLING CONSULTANT 25 <br />WELD & BACK HOE 5 <br />BUILD PAD 1