My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-31_REVISION - M1977129
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977129
>
2009-03-31_REVISION - M1977129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:18:57 PM
Creation date
4/7/2009 3:10:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977129
IBM Index Class Name
REVISION
Doc Date
3/31/2009
Doc Name
TR request
From
Whitewater Building Materials Corporation
To
DRMS
Type & Sequence
TR4
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-ryvll,sss <br />WHITEWATER BUILDING MATERIALS CORPORATION? <br /> <br />SAND & GRAVEL PRODUCTS <br />Phone: (970) 242-7537 <br />30 March 2009 <br />940 South 10th Street, AO. Box 1769 <br />GRAND JUNCTION, COLORADO 81502 <br />Colorado Division of Reclamation, Mining and Safet;/ <br />Western Colorado Regional Office <br />101 South 3rd Street, Room 301 <br />Grand Junction, Colorado 81501 <br />Re: MLR Permit M-77-129 ? -rt- .0 'A <br />Att: Travis Marshall, <br />APR 0 7 2009 <br />Division of Reclamation, <br />Nli,;ng and Safety <br />Whitewater requests a Technical Revision as follows for the above <br />MLR Permit. This TR will bring our Permit up to date with current <br />conditions and follows your on site inspection of 28 January '09. <br />Item 1. Due to Whitewaters desire to keep its viable agricultural <br />field in the western portion of Stage 3B as long as possible, We <br />would like to change the nomenclature of Stage 4B by adding it to <br />and make it part of 3B. Extraction of Stage 3B has started and <br />the overburden is being placed in the area of TR-1, 2004. This <br />change in the Stage numbering will not make any changes to our <br />Reclamation Permit and will simply bring our numbering system up <br />to date with current operations. Eventually all of Stage 3B will <br />be mined as shown in our permit. <br />Item 2. With the change in nomenclature of Stage 4B we would <br />change Stage 4A to Stage 4. <br />Item 3. Mining of Stage 4 will happen before the final mining of <br />Stage 3A and the enlarged Stage 3B. Materials from Stage 4 will <br />be moved North across these stages. <br />Item 4. As shown in our 2008 Annual Report the lake created in <br />Stage 3A will not be enlarged until the silt pond ( west 1/3rd ) <br />fills and more silt pond is needed. <br />Due to these changes Whitewater will, as it has always done, <br />slope and shape as we move forward with extraction of any stage. <br />This will be done so that there is no more than 1500 Ln. Ft, of <br />unfinished slope. <br />READY MIXED CONCRETE <br />Phone: (970) 242-4843 <br />RECEIVE <br />MAR 3 12009 <br />GRAND JUNCTION FIELD, <br />DIIN OF <br />RECLAMATION-MINING & r "-c'E` - ME Page one of two <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.