My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-06_PERMIT FILE - M2009023
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009023
>
2009-04-06_PERMIT FILE - M2009023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:13 PM
Creation date
4/7/2009 9:02:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009023
IBM Index Class Name
PERMIT FILE
Doc Date
4/6/2009
Doc Name
Conditions for approval
From
DWR
To
DRMS
Email Name
KAP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-~'~~ <br />DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />Response to Reclamation Permit Application Consideration <br /> <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Dick Wolfe, P.E. <br />Director <br />DATE: April 3, 2009 <br />TO: Kate A. Pickford, Environmental Protection Specialist <br />CC: Division 7 Office; District 33 Water Commissioner <br />FROM: Sarah Reinsel, E.LT. ,:~~_~. ~C~~~~~ <br />RE: Red Mesa Pit, File No. M-2009-023 `/ o~ <br />Operator: Skanska USA Civil West RMD APR Q ~ LUO~ <br />Contact: Craig Wickstrom <br />Section 7, Twp 33N, Rng 12W, N.M. P.M., La Plata County ~~~nd~~ `~ <br />A~r~iA1g <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />^ reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS: This application is for the conversion of a 111 permit, no. M-1999-086, to a 112 permit. <br />The exposed ground water at the existing Red Mesa Pit has been addressed by the Division of Water <br />Resources in a letter dated January 3, 2002. Mining of the remaining portion of the pit under this permit <br />will not expose any additional ground water or impact any surface water rights. <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303-866-3581 • Fax: 303-866-3589 <br />www.water. state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.