Laserfiche WebLink
ADDENDUM 1 -- Notice Requirements <br />1.6.2(1)(b) <br />1.6.2(1)(b) Prior to submitting the application to the Office for a 112 Reclamation Permit, <br />post notices (signs) at the location of the proposed mine site, as required by the Office, of <br />sufficient size and number to clearly identify the site as the location of a proposed mining <br />operation giving name, address, and phone number of the Applicant, and stating that (name <br />of Applicant) has applied for a mining permit with the Colorado Mined Land Reclamation <br />Board. Anyone wishing to comment on the application may view the application at the <br />County Clerk's or Recorder's Office and should send comments prior to the end of the public <br />comment period to the Colorado Mined Land Reclamation Office, and state the Office's <br />address, as given on the cover of these Rules. For any class of 110 Limited Impact of 111 <br />Special Operation, the Applicant need only post notice at the location of the proposed access <br />to the site. After having posted such notice, failure by an Applicant to maintain such notice <br />(sign) shall not constitute just cause to deny approval of the application. At the time the <br />application is filed with the Office, the Applicant shall provide a signed affidavit that such <br />notice (sign) was posted according to the provisions of this Rule.