Laserfiche WebLink
G <br />tescribe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetatiop. Spe 'fy approximate topsoil redistribution depth: <br />AIA .1,„. .,. Ili i_ r, L <br />4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> <br />5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: