Laserfiche WebLink
Revised Liability / <br />Required Surety <br />Total Liability Both Areas - TR37 <br />Phase I Release <br />T R-41 <br />Pre-Law <br />Phase II <br />Current <br />Int./Perm. Program Beginning Liability <br />Phase I - up to 60% <br />Phase II - up to add'I 25% <br />Phase III - up to add'I 15% <br />$10,839,506.00 <br />($3,679,464.00) <br />$23,447.00 <br />($871,645.00) <br />($1,975,695.00) <br />$4,336.149.00 <br />Maximum Release Amount <br />$9,507,953.00 <br />($5,704,771.80) <br />($2,376,988.25) <br />($1,426,192.95) <br />$7,160,042.00 <br />$7,183,489.00 <br />$6,311,844.00 <br />$4,336.149.00 <br />Actual Release Amount <br />($3,481,593.00) <br />($1,975,695.00) <br />Revised Required Surety <br />$6,026,360.00 <br />$4,050,665.00 <br />Total released Phase I and all Pre-Law was $4,551,109.00. <br />SCC/DRMS agreed to separate Pre-Law and Interim/Permanent program, so Pre-Law Release was $1,069,516.00. <br />After backing out the pre-law release of $1,069,516.00, $3,481,593.00 has been released for Phase I on int./permanent program.