Laserfiche WebLink
CDPS FACILITY INSPECTION REPORT <br />Code CDPS Permit No. Insp. Date Insp Type --?Inspector Facility Type Rating Biomonitoring QA CSunty No. <br />I '• I[-COG450042 11/198008 © I I F-4-1 I I L"' J <br />Name of Facility Entry Tame <br />Oakridge Energy, Inc. (Carbon Junction Mine) 1000:00 AM Permit effective date: <br />7/18008-? <br />Physical Location: <br />2 miles south of Durango, off Hwy 3, up on Ewing Mesa. Permit expiration date: <br />Name(s) of On-Site Representative(s) Phone No. 6/308013 <br />Michael Savage, Savage & Savage Windsor, Cobrado) 970474-8080 <br />Facility Mailing Address: <br />Oakridge Energy, Inc. (Sandra Pautsky, President), 4613 Jacksboro Highway, Wichita Falls 76302 <br />Treatment <br />Facility Level: <br />Operator Level <br />Certificate M <br />Operator In charge: Bryan Duff (Goff Eng <br />Email Address: <br /># of Operators: <br />Phone #: 970-247-1705 <br />of Person(s) Conduc <br />Brand, WQCD-Durango <br />Collection <br />Facility Level: <br />Operator Level <br />Certificate M <br />Operator in charge. <br /> <br />Emmag Address: <br /># of Operators: [? <br />Phone #: <br />Title: Phone No. <br />District Engineer 970-247-5702 <br />(S s Safisfactary. M = Marginal, U = UnsafidacWy, N/A = Not Appikeble, N = Not EvaluatBO <br />TSS Permit TFlow Measuring <br />S Records/Reports Laboratory <br />Site Review Effluent/Receiving Water <br />On Site Analysis: r--- <br />Contract Lab: Green Analytical - Durango <br />Total Taps: l J Industrial Taps: <br />Design Capacity - Hydraulic (MGD): 1.4 <br />Design Capacity - Organic (Wday): 0 <br />n/a Pretreatment <br />S Compliance Schedule <br />S Self monitoring <br />Sample Per Permft: Yes <br />Does Permit Match Facility <br />No. of Lift Stations: <br />S Operations/Maintenance <br />n/a Biosolids Disposal <br />S Stormwater <br />Na SSO CMOM <br />?: Yes <br />1/1 Problem: No <br />Treatment Process(es) Used <br />Present Hydraulic Loading (MGD):F--6-7] Hydraulic Capacity Used %: 0% <br />Present Organic Loading (#/day): 0 Organic Capacity Used %: <br />Treatment Units <br />aBarscreen DMechanical Bar Screen ?Cmnminutorr ?Grit Removal Primary Clarifier <br />?Activated Sludge F]RBC DSBR ?Trickling Filter Secondary Clarifier ?Anaerobic Digester <br />?Aerobic Digester ?Filter Press Centrifuge Drying Bed ?CL2 ?DeCL2 ?W E]Filter <br />Coagulation Polishing Pond Lagoon ?Aerated Lagoon Land Trmt / Reuse DWetlands <br />^T <br />Other Treatment: 2 Stormwater (surface water only) retention ponds Pond #-1"= 6.5 IutG Pond #2 =1.4 MG <br />COMMENTS: Oakridge Energy has submitted a Discharge Termination Request so final reclamation of the site can be cornpleted- <br />Outfall Latitude Longitude Flow Device Date Calibrated Accurate? Outfall Name <br />---------- - <br />001 37 14' 26"N 107 51' 36"W Parshall flumes -- --- - -------_-_-_-__._- - <br />9/3012004 Yes Sediment Pond # 1 <br />002 37 14' 46"N 107 51' 31"W Parshall flumes 9/30/2004 Yes Sediment Pond # 2