My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-31_REVISION - C1980005
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2009-03-31_REVISION - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:59 PM
Creation date
4/2/2009 2:35:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
REVISION
Doc Date
3/31/2009
Doc Name
Reclamation Cost Estimate Summary Review
From
Dan Mathews
To
Susan Burgmaier
Type & Sequence
SL3
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 31, 2009 <br />Re: Seneca II Mine (C-1980-005) <br />SL03 Phase II Bond Release Request BRB2 and BRB3 <br />Reclamation Cost Estimate Summary <br />The Division has completed a revised cost estimate for remaining reclamation liability following <br />the proposed Phase II Bond Release SL-3 at the Seneca II Mine. The new estimated cost for <br />reclamation of the interim and permanent program areas is $4,050,665.00. Estimated costs for <br />the pre-law areas remain unchanged at $285,484.00, so the total required performance bond for <br />the site will now be $4,336,149.00. The required liability will be reduced by $1,975,695.00. The <br />full cost estimate is available in the DRMS files. <br />Aside from the obvious reduction owing to our Phase II release proposal, there are other <br />changes in the estimated reclamation costs, mainly due to rising labor, equipment, and <br />materials costs. A brief summary of those changes follows. <br />Worksheet 00b: The total cost of reclaiming the remaining Wadge area access road rose <br />slightly because of higher equipment operating costs. <br />Worksheet 00c: As noted by SCC, the majority of the cost for these tasks is sealing of the wells. <br />Two years ago we did some research on well sealing costs which resulted in a reduction in our <br />estimated costs for well sealing, thus the total amount for this worksheet is reduced <br />considerably. Costs for reclaiming the ditches and truck wash ponds increased slightly due to <br />higher equipment operating costs. <br />Worksheet 00d: The total cost of reclaiming the landfill area rose slightly because of higher <br />equipment operating costs. <br />Worksheet 00e: The total cost of constructing postmine drainages rose slightly because of <br />higher equipment and materials costs. <br />Worksheet 00f: The total cost of facilities area reclamation increased significantly due to higher <br />equipment operating and labor costs, particularly for demolition of buildings.
The URL can be used to link to this page
Your browser does not support the video tag.