Laserfiche WebLink
<br />INSPECTION REPORT - EAST TAYLOR FILL <br />INDICATE QUARTER 1sT (9 2ND 3RD 4TH 2009 <br />YEAR <br />*ALL QUARTERS NEED TO BE CERTIFIED* <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPORTED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No N/A Yes <br />If yes, explain: <br />Date of Survey: 3/25/2009 <br />Reviewed By: Tom Peterson <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No N/A Yes Measured Level <br />If yes, explain: <br />Date of Measurement: 3/25/2009 <br />Measured By: T. Peterson <br />3) Has there been any evidence of surficial slope failure on the face of the fill? <br />No No final fill face established Yes <br />If yes, explain: <br />Date of P.E. Inspection: 3/25/2009 <br />Inspected By: T. Peterson <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No No final fill face established Yes <br />If yes, explain: <br />Date of Inspection: 3/25/2009 <br />Inspected By: T. Peterson <br />?p1?ftlHl?? <br />0 <br />`?: <br />?? Pp0 L C <br />?. F4, V. <br />o ••c.P6•. ?p <br />3 ° ?7r 4?p. I o <br />•? x• <br />Signed: _ 32257 <br />Date: c3?Z ?/ ?? '?i °? '••... ..••'• <br />still THOMAS EAS 3225 RSON <br />Reference Permit - Volume 13, Exhibit 21, Item 1, Introductory Pages <br />CF: HSEQ 24.20.04 <br />Revised Feb. 7, 2008