My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-29_REVISION - C1980004 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2009-03-29_REVISION - C1980004 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:50 PM
Creation date
4/2/2009 11:14:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
REVISION
Doc Date
3/29/2009
Doc Name
2009 Midterm Reivew Cost Estimate
From
DRMS
To
McClane Canyon Mining, LLC
Type & Sequence
MT6
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task # : 003 State : Colorado Permit/job #: C-1980-004 <br />Date : 0.312612009 County: Garfield Abbreviation :none <br />User: ? JRS Site : Mcciane Canyon Mine Filename : 0004-003 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action 2009 Midterm Review <br />Task description :Recontour East Salt Creek Bridge Area <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 322C L <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $34.40 NA <br />Operating cost/hour : $44.83 100 <br />Operator cost/hour : $32.96 NA <br />Total unit cost/hour : $112.20 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 50 BCY factor : 1.270 volume : <br />Source of estimated volume: Permit <br />Source of estimated swell factor :CAT Handbook <br />Horsepower : 162 <br />Weight (MT) : 24. i 9 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $112.20 <br />64 LCY <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket, wing-loaded,dump_bucket,swing empty) <br />Basic job condition description <br />Secondary job condition within basic description <br />Cycle time value : <br />AVERAGE <br />AVERAGE <br />0.29 minutes <br />Bucket Capacity <br />Rated bucket capacity: 1.44 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.97 Sand and gravel (95% - 100%) <br />Adjusted bucket capacity: 1.40 LCY <br />Job Condition Correction Factors <br />Site altitude : 5,600 feet <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />Source <br />Altitude adjustment : 1.00 (Cat HS) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br />287.51 LCY/hour <br />238.63 LCY/hour <br />23$.63 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 0.27 hours <br />Unit cost : $0.470 per LCY Total job cost : $30
The URL can be used to link to this page
Your browser does not support the video tag.