Laserfiche WebLink
CIRCES Cost Estimatina Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task #: 015 State : Colorado Permit/job # : C-1980-004 <br />Date : 0312612009 _ County :Garfield Abbreviation :none <br />User : JRS Site : Mcclane Canyon Mine Filename : 0004-015 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :2009 Midterm Review <br />Task description : Rip McClane to Munger Haul Road <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D9R - 9SU (2005) Horsepower : 405 <br />BMe type 016f millf-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper _ <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $70.58 NA <br />Dozer operating cost/hour : $103.27 100 <br />Ripper operating cost/hour : $7.52 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $214.14 Total fleet cost/hour : $214.14 <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA <br />Area : 0.48 <br />NA <br />acres <br />Load factor : NA Bank volume : NA BCY <br />Rip depth (ft) : 2.00 Volume : 1,549 BCY or CCY <br />Source of estimated quantity :Fig <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />2-2-2; Operator Estimate _ <br />Seismic : Seismic velocity : NA feet/second <br />Unadjusted production : NA cu. yds./hour <br />Area : Avg. ripping depth : 2.63 feet/pass <br />Average ripping width : 7.67 feet/pass <br />Average ripping length : 200.00 feet/pass <br />Average dozer speed : 88.00 feetiminute <br />Average maneuver time _0.25 minutes/pass <br />Production per unit area : 0.838 acres/hour <br />Unadjusted production : 3,553.84 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) <br />Unit cost : $0.073 per cu. yd. <br /> <br />Condition Correction Factors - <br />Unadjusted production <br />per selected method : 3,553.84 cu. yds./hour <br /> <br />Site altitude: 5,600 feet <br />-feet <br />_ <br />Altitude adjustment : 1.00 HB) <br />Job efficiency factor : 0.83 (1 shift/day) <br />Net job correction : 0.83 multiplier <br /> <br />Adjusted unit production : 2,949.69 cu. yds./hour <br />Adjusted fleet production : 2,949.69 cu. yds./hour <br /> <br />Total job time : 0.53 hours <br />Total job cost : $112