My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-10-23_REVISION - C1980006
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980006
>
2007-10-23_REVISION - C1980006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:18:12 PM
Creation date
4/1/2009 3:54:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
REVISION
Doc Date
10/23/2007
Doc Name
OSM Inspection
From
OSM
To
DRMS
Type & Sequence
SL4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />VAT U. S. DEPT. OF THE INTERIOR T °F <br />OFFICE OF SURFACE lrNINCx- _ r <br />y F <br />Mine Site Evaluation lov 2 2007 <br />: A Mate Program <br />/Person <br />itt <br />P <br />1 9. Permit Number 10. Permit Type <br />ee <br />erm <br />. <br /> <br />KERR COAL CO. <br />I <br />C-006-80 <br />PP <br />Add <br />2 11. Field Visit Date 12. Purpose 13. SRA Present <br />ress <br />. <br /> 10/23/2007 OB3 a <br />PO BOX 459 <br />3. City 4. State mm - dd - yyyy <br />14. Permit Status 15. Site Status 16. Facility Type <br />Florence CO <br />BR <br />P1 AF <br />5. Zip Code 6. Phone Number 17. OSM Office # 18. CCID # 19. Land Code <br />81226 (719)784-6395 140 SF <br />7. Operator Name, if Different than Permittee <br />22. County Name <br />State Abrev <br />A ID # 21 <br />M <br />H <br />20 <br />S <br /> . <br />. <br />. <br />. <br />05-02674 . <br />CO . <br />JACKSON <br /> <br />8. Mine Name <br />23 <br />. AVS Permittee Entity ID Number 24. State Office <br />MARR STRIP <br />1 056814 <br />25. Hours 26. Si na a Block 27. R eviewing Offc.ial: <br />0 a. Permit Review <br />3 J WM4 <br />. Signature: Signature: <br />6,0 b. Site Visit Time <br />ELIZABETH SHAEFFER <br />Travel Time <br />8.0 c. <br />Printed Name: Review Date: <br />mm - dd - yyyy <br />L 3.0 d. Report Writing Date: 11/19/2007 Is Supplemental MSE Page Used Y/N Y? <br />Permit Type - Item 10 IP = Interim Program, PP = Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR.... Citizen Complaint Referral (non site visit) <br />Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />0xx <br />.... <br />pxx.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection - Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status - Item 14 AB.... Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 C F R 840.11(g) <br />permitted but not yet disturbed. AB1.. Bond Forfeiture: Bond forfeiture officially in process or completed, and. <br />. Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commenced. <br />IN <br />... <br />Temporary Cessation of Operations. (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation completed and State Regulatory AB3.. Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />ermitted <br />site is un <br />Wh <br />t A <br />li <br />bl <br />NA <br />N <br />. <br />p <br />e: <br />en <br />o <br />pp <br />ca <br />.... <br />Authority (RA) has released all of the bond (Phase III Release.) <br />Site Status Codes - Item 15 NS.. Non-Site Visit: Status of site not determined. <br />ND...No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX.. Coal Exploration: Coal exploration operations TC..Temporary Cessation: The RA has granted performance bond(s), and/or reclama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 816/ tion of forfeited site is in progress. <br />have not begun. 817.131(b). FR.. Forfeited and Reclaimed: Forfeiture <br />Active Coal Producing: Coal surface mining P1...Phase I Release: At least Phase I bond release reclamation completed. <br />AP <br />.. <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />AN <br />.. <br />facility such as tipple or preparation plant. P2.. Phase II Release: At least Phase II bond release WC.Wildcat: Coal mining and reclamation <br />operations have or are taking place and <br />is for the entire permitted area <br />it <br />St <br />t <br />i <br />ti <br />P <br />i <br />. <br />ve, s <br />e <br />a <br />us <br />s ac <br />erm <br />t <br />NM..No Mining: The <br />no surface coal p3.. Phase III Release: Reclamation completed and the activity is not covered by the <br />not in Temporary Cessation <br />, <br />mining activity, and site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes - Item 16 D...Ancillary (Haulroad, Conveyor, and/or Rails) H...Exploration Permits L... Remining site permitted <br />A... Surface E... Refuse and/or Impoundment I... Notice of Intent to Explore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exempt 16 and 2/3 <br />C... Preparation Plant G...Stockpiles K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from <br />small businesses about Federal agene-v enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each agency's <br />responsiveness to small business If you are a small business (a business with 500 or fewer employees including those of affiliates) Page 1 of _ <br />and wish to comment on the enforcement or compliance activities of OSM, call 1-888-REG-FAIR (1-888-734-3247). Revised December 4, 1998
The URL can be used to link to this page
Your browser does not support the video tag.