My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-31_REVISION - C1980006 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980006
>
2008-12-31_REVISION - C1980006 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:22 PM
Creation date
4/1/2009 3:54:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
REVISION
Doc Date
12/31/2008
Doc Name
Email Regarding OSM & BLM Concurrence Letter
From
Janet Binns
To
Elizabeth Shaeffer
Type & Sequence
SL4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EQUIPMENT ..................................................................................................................... <br />ROADABLE sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br /> <br />-Light Duty Pickup, 4x4, 1 T. $37.28 1 $37.28 $37.28 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $37.28 $37.28 <br />. ...................................................................................................................................................................................... <br />E:. UIPMENT HAUL DISTANCE and TIME :................................................................................................................................................................... <br />.................... <br />Q <br />Transportation Cycle Time : <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br /> Nearest major city or town within project area region : Walden <br />Non- Total one-way travel distance : 5.0 miles <br />Roadable Roadable Average travel speed : 40.0 mph <br />Equipment Equipment <br />0.12 0.12 Total non-roadable mob/demob cost" : $1,698.22 <br />0.12 0.12 * two round trips with haul rig <br />0.75 NA Total roadable mob/demob cost ** : $9.32 <br />0.75 NA one round trip, no haul rig <br />1.75 0.25 <br /> <br /> <br />......................... <br />................................. <br />.................. <br />.................................................... <br />I <br />..........................................................Total job time:.:;;:.;:. ;........ ......::.::....hours <br /> <br />3.50 ...... <br /> Total job cost : $1,708
The URL can be used to link to this page
Your browser does not support the video tag.