My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-19_REVISION - C1980006
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980006
>
2008-09-19_REVISION - C1980006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:27 PM
Creation date
4/1/2009 3:53:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
REVISION
Doc Date
9/19/2008
Doc Name
Cost Estimate
From
DRMS
Type & Sequence
SL4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br /> <br />021 -Reseed 8.0 acres at Marr Mine seeded in 1999 revege 1 8.0 $5,157 <br />023 -Reseed load out (after Phase // bond release) revege 1 7.0 $8,672 <br />031 -Regrade Load out pond dozer 1 3.2 $541 <br />029 -Mobilize/demob equipment <br />)dz S, mobilize 3 3.5 $1,152 <br />015 -Seal remaining 6 wells O borehole 1 15.5 $2,931 <br /> <br /> <br /> 01 <br /> LA <br /> <br />" includes inflation factor adjustment of : NA <br />INDIRECT COSTS <br /> <br />SUBTOTALS : 37.Z <br />TOTAL DIRECT COST <br />$18,453 <br />$18,453 <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $373 <br />Performance bond : 1.05 % of direct total = $194 <br />Job superintendent : 18.61 hrs*...$/hr.- $41.25 total = $768 <br />Profit : 10.00 % of direct total = $1,845 <br />"assume net hours = 50% of task hours TOTAL O & P = $3,179 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + 0 & P) = $21,632 <br />Financial warranty processing (legal/related costs) : NA NA NA total = $0 <br />Engineering work and/or contract/bid preparation : 4.25 % of cntr. NA total = $919 <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $1,082 <br />CONTINGENCY - NA* NA total = NA <br />"contingencies accounted for at task level TOTAL INDIRECT COST = $5,180 <br />TOTAL BOND AMOUNT (direct + indirect) _ $23,633 <br />
The URL can be used to link to this page
Your browser does not support the video tag.