Laserfiche WebLink
Letter to Richard Blubaugh 2 March 31, 2009 <br />Centennial Project Receipt of Modification MD-02 File No. P-2008-043 <br />the two mile zone. For water quality data generated from samples collected by Powertech, provide the <br />field notes from each sample collection event. State affirmatively for all wells installed or rehabilitated <br />by Powertech in the two mile zone that the Standard Operating Procedure (SOP) for monitoring well <br />installation approved by DRMS was followed, or if there have been variations from the SOP describe the <br />variations, the reasons for the variations, and their potential affects on the usefulness of the wells. For the <br />water quality data from the two mile zone generated from samples collected by Powertech, state <br />affirmatively that the following SOPs were followed, or if there have been variations from the SOPs <br />describe the variations, the reasons for the variations, and their potential affects on the data collected: <br />i. Decontamination of Sampling Equipment <br />ii. Purging and Sampling Monitoring Wells <br />iii. Field Parameter Measurements (Including Instrument Calibration) <br />iv. Note Taking and Log Book Entries <br />v. Analytical Data Validation <br />The water quality data from wells IS-003T and IS-003Ta is the most representative of water quality at the <br />proposed pump test wells and disposal pit available at this time. Further characterization of water quality <br />at the proposed pump test location is discussed in item no. four below. Other than the data from the IS- <br />003T and IS-003Ta samples collected June 23, 2008, is there any other data from these wells? If so, <br />provide the data in accordance with the discussion above. <br />d. Powertech stated in MD-02 that it has done preliminary hydrogeologic modeling and water production <br />calculations for the strata to be investigated by the proposed pump test. Please provide these for DRMS <br />review. Provide data and analysis of all aquifer and aquitard properties from the Centennial Project area <br />developed from pump tests previously conducted by Powertech, and from documents in Powertech <br />possession from testing done by Rocky Mountain Energy. This information will be useful in completing <br />a more rigorous ground water chemical mixing analysis as discussed in item no. four below. <br />4. The ground water chemical mixing analysis provided in MD-02 must be redone and tailored using the <br />information available on stratigraphy, aquifer and aquitard properties, ground water hydrology, and ground <br />water quality required for submittal under item three above. The mixing analysis provided in MD-02 <br />assumes column permeation from the base of the proposed disposal pit to the water table, and uniform <br />columnar mixing from the water table to the base of the Laramie Formation. Since the stratigraphy of the <br />Laramie Formation in the project area is characterized by vertical permeability much lower than horizontal <br />permeability, it is more likely that water infiltration through the base of the proposed disposal pit will pool <br />on low permeability strata and flow laterally away from the pit location. Using the information required for <br />submittal under item no. three above, Powertech must construct and submit an analysis of the flow path of <br />the water from the pit, and if that analysis indicates that pit water will reach the water table, provide a mixing <br />analysis and map boundaries where all metals and radionuclides that exceed ground water standards in the <br />A2 sand ground water will be diluted to levels below standards. The DRMS will also require that radon be <br />included in the mixing analysis. Depending on the degree of certainty that can be assigned to the analytical <br />results, the location of the predicted boundaries where standards will be met, and the current and potential <br />future use of Laramie Formation ground water in the project area, the DRMS will determine if the impacts to <br />the prevailing hydrologic balance will be sufficiently minimized to allow the disposal pit to be constructed <br />and used.