Laserfiche WebLink
Table N-5 <br />• PHC East Salt Creek (2005) SW-1 <br /> East Salt Mine Flow Conductivity Conductivity Conductivity °~o <br /> Creek Flow SW-1 Mine' Combined Increase <br /> Decreas <br /> CFS CFS umho/cm umho/cm umho/cm e <br /> 2005 <br />Dec-04 4Q/04 3.50 0.23 ~ 822 1810 1821 0.0% <br />Jan-05 5.10 0.23 1806 1818 1806 0.0% <br />Feb-05 6.70 0.23 1789 1970 1795 0.3% <br />Mar-05 1Q/05 8.30 0.23 1773 1815 1774 0.1% <br />Apr-05 8.83 0.23 1705 1814 1708 0.2% <br />May-05 9.37 0.23 1638 1862 1643 0.3% <br />Jun-05 2Q/05 9.90 0.23 1570 1872 1577 0.4% <br />Jul-05 6.73 0.23 1898 1906 1898 0.0% <br />Aug-05 3.57 0,23 2225 1904 2206 -0.9% <br />Sep-05 3Q/05 0.40 0.23 2553 1865 2302 -9.8% <br />Oct-05 1.00 0.23 2885 1970 2714 -5.9% <br />Nov-05 1.60 0.23 3216 1970 3060 -4.9% <br />Dec-05 4Q/05 0.30 0.23 3548 1970 2863 -19.3% <br /> <br /> IRRIGATION SEASON MASS BALANCE (CONDUCTIVITY): <br /> SW-1: 1773 <br /> COMBINED: 1777 <br /> INCREASE/DECREASE: 0.2% <br />~' hline'refers to the Mine ~~ Coal Mine Waste Pile Leachate <br />NN Average conductivity of 1970 was used for the combined flow when no data was availab/e <br />NN Irrigation season mass balance =flow*conductivity/sum ofirrigation season flows <br />NN Actual values shown in black <br />•~N Interpolated values shown in <br />blue <br />NN Extrapolated values shown in <br />green <br />• <br />Appendix N - TR-16 - 8 - 10/08 <br />