Laserfiche WebLink
Colorado Department of Public Health and Environment <br />Air Pollution Control Division <br />McClane Canyon Mining LLC -Surface Support Facilities for McClane Canyon Mine <br />Permit No. 99GA0684 <br />Final Approval <br />GENERAL TERMS AND CONDITIONS: (IMPORTANTI READ ITEMS 5.6.7 AND S) <br />1. This permit is issued in reliance upon the accuracy and completeness of information supplied by the <br />applicant and is conditioned upon conduct of the activity, or construction, installation and operation of the <br />source, in accordance with this information and with representations made by the applicant or applicant's agents. <br />It is valid only for the equipment and operations or activity specifically identified on the permit. <br />2. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been <br />determined by the APCD to be necessary to assure compliance with the provisions of Section 25-7-114.5(7)(a), <br />C.R.S. <br />3. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or <br />appeal o~ a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this <br />permit shall be deemed denied ab inita. This permit may be revoked at anytime prior to final approval by the <br />Air Pollution Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and <br />regulations of the Air Quality Control Commission (AQCC), including failure to meet any express term or <br />condition of the permit. If the Division denies a permit, conditions imposed upon a permit are contested by the <br />applicant, or the Division revokes a permit, the applicant or owner or operator of a source may request a hearing <br />before the AQCC for review of the Division's action. <br />4. This permit and any required attachments must be retained and made available for inspection upon request <br />at the location set forth herein. W ith respect to a portable source that is moved to a new location, a copy of the <br />Relocation Notice (required by law to be submitted to the APCD whenever a portable source is relocated) <br />should be attached to this permit. The permit may be reissued to a new owner by the APCD as provided in <br />AQCC Regulation No. 3, Part B, Section II.B. upon a request for transfer of ownership and the submittal of a <br />revised APEN and the required fee. <br />5. Issuance (initial approval) of an emission permit does not provide "final" authority for this activity or <br />operation of this source. Final approval of the permit must be secured from the APCD in writing in accordance <br />with the provisions of 25-7-114.5(12xa) C.RS. and AQCC Regulation No. 3, Part B, Section III.G. Final <br />approval cannot be granted until the operation or activity commences and has been verified by the APCD as <br />conforming in all respects with the conditions of the permit. If the APCD so determines, it will provide written <br />documentation of such final approval, which does constitute "final" authority to operate. Compliance with the <br />permit conditions must be demonstrated within I80 days after commencement of operation. . <br />6. THIS PERMIT AUTOMATICALLY EXPIRES l:F you (1) do not commence construction or operation <br />within 18 months after either the date of issuance of this permit or the date on which such construction or <br />activity was scheduled to commence as set forth in the permit, whichever is later; (2) discontinue construction <br />for a period of 18 months or more; or (3) do not complete construction within a reasonable time ofthe estimated <br />completion date. Extensions of the expiration date may be granted by the APCD upon a showing of good cause <br />bythe permittee prior to the expiration date. <br />7. YOU MUST notify the APCD at least thirty days (fifteen days for portable sources) prior to <br />commencement of the permitted operation or activity. Failure to do so is a violation of Section 25-7- <br />114.5(12)(x), C.R.S. and AQCC Regulation No. 3, Part B, Section III.G.1., and can result in the revocation of <br />the permit. You must demonstrate compliance with the permit conditions within 180 days after commencement <br />of operation as stated in condition S. <br />8. Section 25-7-I 14.7(2)(a), C.RS. requires that all sources required to file an Air PollutionEmissionNotice <br />(APEN) must pay an annual fee to cover the costs of inspections and administration. If a source or activity is <br />to be discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon <br />notification, annual fee billing wiil terminate. <br />9. Violation of the terms of a permit or of the provisions of the Colorado Air Pollution Prevention and control <br />Act or the regulations of the AQCC may result in administrative, civil or criminal enforcement actions under <br />Sections 25-7-115 (enforcement), -121 (injunctions), -122 (civil penalties), -122.1 (criminal penalties), C.RS. <br />• <br />AIRS Point ID: 045/0017/007 Page 6 of 6 <br />