Laserfiche WebLink
4-7 <br />road was upgraded during exploration development, and approximately half acre of <br />disturbance is associated with the office complex. <br />Potable water storage tanks and a waste water treatment system are associated with <br />the office area. Potable water will be delivered to the mine to be used at the offices and <br />then added to the groundwater system via the septic tank and leach field. This minimal <br />addition will have no effect upon the quantity of water available in the groundwater <br />system when compared to the amount of water in the system. <br />The quality of the groundwater will show no appreciable change from the existing <br />quality. The potable water delivered to the mine will be used for showers and sanitary <br />facilities in the mine bathhouse. Water added to the alluvial aquifer after use will <br />probably be better quality than the groundwater in the area. (See Appendix N). Due to <br />the addition of a coal mine waste pile and associate facilities as part of TR-16 (2008), <br />another monitoring well was installed, GW-9, South and East of the new Office <br />Sediment pond. <br />TR-16 M`-Volume 1 (Rev 07/08) <br />