My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-02_PERMIT FILE - C1980004A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980004
>
2009-03-02_PERMIT FILE - C1980004A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:00 PM
Creation date
3/31/2009 1:23:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004A
IBM Index Class Name
Permit File
Doc Date
3/2/2009
Section_Exhibit Name
3.0 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3-1 <br />3.0 RECLAMATION PLAN <br />This reclamation plan addresses rehabilitation of the McClane Canyon <br />Mine located in Garfield County, Colorado. The area is located in a zone of <br />transition saltbrush desert and pinyon juniper woodland. Precipitation is about <br />10 inches annually and soils are derived mainly from sandstone <br />alluvium/colluvium. Although precipitation is low, soils are more favorable for <br />reclamation than the shale derived soils of many salt desert areas. Research <br />and demonstration of reclamation in salt desert has been reported in the works of <br />McKell, VanEpps, and co-workers in Utah. A bibliography of those works and <br />other relevant works is contained at the end of this section. These works have <br />demonstrated the need for the use of adapted native plant species and <br />maintenance of favorable soil moisture through mulching, surface manipulation, <br />and/or limited imgation. The land uses prior to mining activity were wildlife <br />habitat and rangeland. The site will be returned to these land uses following <br />mining. <br />Sites to be reclaimed include the mine portal and facilities area, the haul <br />road, the sediment pond, topsoil and construction material storage and the office <br />areas (See Reclamation Map, Figure 3.1-1 ). Of these areas to be reclaimed, all <br />but the sediment pond, topsoil and construction material storage, coal mine <br />waste pile and office areas were disturbed prior SMCRA. Removal of topsoil is <br />therefore confined to those areas, which were or are to be disturbed after the <br />enactment of SMCRA. That portion of the haul road existing prior to mining will <br />be reclaimed even though access for local ranchers using areas to the east will <br />be eliminated. <br />The distribution power line will be reclaimed based on recommendations <br />from Steve Don, Manager of Engineering with Grand Valley Power (GVP) (See <br />Table 3.7.3). The Operator, in conjunction with GVP, will remove distribution <br />power poles to pole number 341, the rest of the power line is considered GVP's <br />mainline and will remain in place to continue serving customers north of the <br />mine. See Figure 2.2-2 for the location of pole 341. <br />TR-16 M`-Volume 1 (Rev 05/08) <br />
The URL can be used to link to this page
Your browser does not support the video tag.