Laserfiche WebLink
Estimates of topsoil, overburden and sand and gravel reserves at Morton Lakes are <br />as follows: <br />Mining Stage Acres Topsoil in <br />Cubic Yards Overburden in <br />Cubic Yards Sand and <br />Gravel in Tons Ave. Depth <br />to Bedrock <br /> <br />Stage 1 17 27,500 57,500 1,000,000 25 feet <br />Stage 2 21.6 45,000 60,000 1,300,000 33 feet <br />Stage 3 36.4 32,300 65,000 2,200,000 34 feet <br />Stage 4 37.3 64,000 136,000 2,240,000 35 feet <br />Stage 5 19.3 29,400 62,600 960,000 28 feet <br />Totals 131.6 198,200 381,100 7,700,000