Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 065 State : Colorado Permit/job #: C-1980-004 <br />Date : 0312912009 County :Garfield Abbreviation :none <br />User : JRS Site: Mcc/ane Canyon Mine Filename :0004-065 <br />Permit or other job action :2009 Midterm Review <br />Task description :Mobilize/Demobilize Equipment for Initial Reclamation <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.0 $25.39 $25.39 <br />Total Unit Cost/hour.-$88.J67 $117.55 $125.45 <br />r_ - <br />Alr%KJ_DnAnAR1 F r-n111PM1=NT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D9R - 9SU (2005) 66.73 $62.35 $125.45 1 $187.80 $125.45 $250.00 <br />-ATLAS COPCO ROC D3-0 11.17 $37.89 $88.67 1 $126.56 $88.67 $250.00 <br />-Cat 322C L 26.68 $34.40 $117.55 1 $151.95 $117.55 $250.00 <br />-CAT 12H 14.41 $20.87 $88.67 1 $109.54 $88.67 $250.00 <br />-Cat 627G 40.90 $55.31 $117.55. 1 $172.86 $117.55 $250.00 <br />-Reveg Equipment 20.00 $78.00 $88.67 1 $166.67 $88.67 $250.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $915.40 $626.56 $1,500.00 <br />sheet 1 of 2