Laserfiche WebLink
PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 034 State : Colorado <br />Date : 0312512009 County :Garfield <br />User : JRS Site :Mcclane Canyon Mine <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action 2009 Midterm Review <br />Task description : Regrade Coal Mine Waste Pile Pond <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source: <br />(CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $71.49 NA <br /> Operating cost/hour : $103.27 100 <br /> Ripper op. cost/hour : $1.61 20 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $209.15 Total fleet cost/ho ur : $209.15 <br /> <br />MATERIAL QUANTITIES j <br />Initial Swell Loose <br />volume : 3,500 CCY factor : 1.165 volume : 4,078 LCY <br /> <br />Source of estimated volume : Figure 2.2-3, Operator Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 125 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,055.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Compacted till or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,450 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.32 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 338.92 LCY/hr <br /> Adjusted fleet production : 338.92 LCY/hr <br /> E <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 12.03 Hours <br />Unit cost : $0.617 /LCY Total job cost : $2,516 <br /> <br />Permit/job# : C-1980-004 <br />Abbreviation :none <br />Filename :0004-034