My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-29_REVISION - C1980004
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2009-03-29_REVISION - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:50 PM
Creation date
3/30/2009 1:14:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
REVISION
Doc Date
3/29/2009
Doc Name
2009 Midterm Review
From
DRMS
Type & Sequence
MT6
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
McClane Canyon Mine C-1980-004 <br />9004 MAtarm RaviaUi <br />PROJECT IDENTIFICATION <br />Date : 29-Mar-09 Permit C-1980-004 Site: McClane Canyon Mine <br />User: JRS State : Colorado <br /> Filename: C065-000 County: Garfield <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: 2009 Midterm Review <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />001 Regrade Mine Bench Areas and Reconstruct Ephemeral Drainages 165.40 $34,325 <br />002 Regrade Steep Slope Area South of Shop 25.10 $2,816 <br />003 Recontour East Salt Creek Bridge Area 0.27 $30 <br />004 Regrade Drill Pad from Minor Revision 37 1.61 $333 <br /> <br />007 Regrade Construction Material Stockpile 2.98 $618 <br />008 Spread and Compact Uncompacted Refuse at Coal Mine Waste Pile 5.22 $696 <br />009 Place Three Feet of Cover on Coal Mine Waste Pile 37.55 $7,598 <br /> <br />014 Rip Backfilled and Rough Graded Areas 7.33 $1,569 <br />015 Rip McClane to Munger Haul Road 0.53 $112 <br />016 Rip Construction Material Stockpile 0.60 $129 <br /> <br />020 Pull Main Haul Road Fill Material to Base of Cut Slope Bench 31.69 $3,556 <br />021 Recontour Main Haul Road Surfaces 31.44 $6,524 <br />022 Regrade Light-Use Road from Minor Revision 37 16.05 $3,332 <br /> <br />024 Finish Grade All Backfilled Areas 6.78 $526 <br /> <br />028 Stream Channel Erosion Protection 24.00 $47,221 <br /> <br />032 Backfill and Regrade Sediment Pond, Drying Area and Office 12.53 $2,600 <br />033 Regrade Diversion Ditches 1.12 $125 <br />034 Regrade Coal Mine Waste Pile Pond 12.03 $2,516 <br /> <br />038 Replace Topsoil from Stockpile to Mine Bench Area 7.11 $1,439 <br />039 Replace Topsoil from Stockpile to Sediment Pond and Office Area 3.31 $671 <br />040 Replace Topsoil from Stockpile to Road from McClane to Munger 6.56 $1,328 <br />041 Replace Topsoil from Stockpile to Coal Mine Waste Pile 35.05 $7,091 <br />jrs Page 1 30-03-09
The URL can be used to link to this page
Your browser does not support the video tag.