Laserfiche WebLink
Coal Ridge Mine C-1984-065 <br />90nG Mirltarm Raviaw <br />PROJECT IDENTIFICATION <br />Date : 29-Mar-09 Permit C-1984-065 Site: Coal Ridge Mine <br />User: JRS State : Colorado <br /> Filename: C065-000 County: Garfield <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: 2009 Midterm Review <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />006 Backfill Sediment Pond 33.27 $5,557 <br />009 Backfill Berm Associated with SAE #2 0.77 $128 <br />016 Replace Topsoil from Stockpile to Sediment Pond 25.82 $4,165 <br />024 Reseed Areas with Cropland Mix 11.90 $1,229 <br />025 Reseed Pond Area with Cropland Mix 1.90 $196 <br />026 Reseed Pasture/Wildlife Habitat 25.30 $5,633 <br />027 Reseed Topsoil Stockpile Footprint with Pasture/Wildlife Habitat 1.80 $401 <br />028 Reseed Portal Slopes with Basic and Woody Mix 2.30 $1,732 <br />029 Mobilize/Demobilize Equipment for Reseeding and Pond Removal 3.02 $2,974 <br /> <br /> Direct Cost Total 106.08 $22,015 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (1.55% of Direct Costs) $341 <br /> Performance Bond (1.05% of Direct Costs) $231 <br /> Job Superintendent (at $41.25/hour) 53.04 $2,188 <br /> Profit (10.00% of Direct Costs) $2,202 <br /> <br /> Total Overhead and Profit $4,962 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) $26,977 <br /> <br /> Le ag_1=Engineering - Project Mana eg ment <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) $1,147 <br /> Reclamation Management and Administration (3.25% of Contract) $877 <br /> <br /> TOTAL BOND AMOUNT $29,000 <br />jrs Page 1 30-03-09