Laserfiche WebLink
RSS Substation A <br />Area: 0.04 Acres <br />CN: 85 (Utaline B) <br />Runoff: 0.39"/12 x 0.04 Acres = .001 Acre-Ft. <br />RSS Substation B <br />Area: 0.04 Acres <br />CN: 85(Utaline B) <br />Runoff: 0.39"/12 x 0.04 Acres = 0.001 Acre-Ft. <br />2 West Portal -North Portal <br />Area: 0.119 Acres <br />CN: 86 (Lazear (D), 50% dirt road, 50% Sage-grass, 20% cover) <br />Runoff: 0.43"/12 x 0.119 Acres = 0.004 Acre-Ft. <br />2 West Portal -South Portal <br />Area: 0.244 Acres <br />CN: 86 (Lazear (D), 50% dirt road, 50% Sage-grass, 20% cover) <br />Runoff: 0.43"/12 x 0.244 Acres = 0.009 Acre-Ft. <br />2 West Portal -Overburden Stockpile <br />Area: 0.202 Acres <br />• CN: 89 (Lazear (D), 100% dirt road) <br />Runoff: 0.55"/12 x 0.202 Acres = 0.009 Acre-Ft. <br />2 West Portal -Substation <br />Area: 0.180 Acres <br />CN: 89 (Lazear (D), 100% dirt road) <br />Runoff: 0.55"112 x 0.180 Acres = 0.008 Acre-Ft. <br />• 13-3-2 (New 3/1/96) <br />