Laserfiche WebLink
2.02 GENERAL REQUIREMENTS FOR COAL EXPLORATION <br />2.02.1 Scope <br />The scope of this Section establishes requirements for coal exploration outside the <br />approved permit area. <br />TCLLC plans only to conduct coal sizing and loadout operations at its facility. Since <br />no coal will be mined, TCLLC does not anticipate a need for coal exploration at its <br />operation. Therefore, this Section is not applicable. <br />MR-2~ 2.02-1 Rev. Dec. 2008 <br />A PP~~vED <br />~:,{ ~ f a 9 <br />