Laserfiche WebLink
(Page 3) <br />MINE ID # OR PROSPECTING ID #: -lid-1974-099 <br />INSPECTION DATE: ).19A49 INSPECTOR=S INITIALS: MA(- <br />The following problems (PB) and/or possible violations (PV) (and suggested corrective actions) were identified <br />during this inspection. The problems should be corrected by the dates given, or they will become possible <br />violations. The possible violations should be corrected by the dates given to reduce their severity when considered <br />by the Mined Land Reclamation Board. The inspector noted on the previous page should be notified of all <br />corrective actions taken. <br />PROBLEMS/POSSIBLE VIOLATIONS <br />AND <br />CORRECTIVE ACTIONS <br />1. The Operator is backfilling using structural fill material generated offsite. <br />The Operator shall submit a notice to the Division per the requirements of Rule 3.1.5(9) (a)-(f) <br />CORRECTION <br />DATE <br />4/10 /09 <br />PB or PV: PB_ <br />TOPIC(S): --BAa <br />The notice must be submitted to the Division on or before April 10, 2009.