Laserfiche WebLink
Task 085 SLB Addendum to Seneca II Reclamation Cost Estimate <br />C-1980-005 3/17/2009 Dredge Sediment Ponds <br />Dredge Ponds 004 and 008 during liability period. <br />Based on SCC estimate. <br />Assume 16 ac. ft. (25,800 c.y.) one time <br />Mob/Demob 1.00 $6,375.00 $6,375.00 <br />Pumping 25,800.00 $5.92 $152,736.00 <br />Total $159,111.00