Laserfiche WebLink
Task 83 SLB Addendum to Seneca II Reclamation Cost Estimate <br />C-1980-005 3/17/2009 Stabilize Post-Mining Drainage Channels <br />Rip Rap CY Cost/CY Total Rip Rap Cost Gravel CY Cost/CY Total Gravel Cost Mat SY Cost SY Total Mat Cost Total <br />$51.05 $32.69 $2.37 <br />PM-8 <br />V-Ditch #1 - NA <br />V-Ditch #2 - NA <br />V-Ditch #3 - NA <br />V-Ditch #4 - NA <br />V-Ditch #5 - NA <br />Trap. from V-1 <br />Trap. from V-2 <br />Trap. from V-3 <br />Trap. from V-4 <br />Trap.from V5 to end <br />PM12A <br />Total CY <br />Haul to site <br />Gravel <br />Rip Rap <br />93.27 <br />71.11 <br />62.63 <br />491.625 <br />718.635 $51.05 <br />Tons $/ton <br />1006.089 $16.45 <br />$0.00 <br />$4,761.43 <br />$3,630.17 <br />$3,197.26 <br />$25,097.46 <br />28.33 <br />$36,686.32 28.33 $32.69 <br />Tons $/ton <br />46.03625 $6.74 <br />$16,550.16 <br />Total Cost $53,236.48 <br />Means 2009 Location adjustment is 105.7% <br />Gravel - Means Site Work and Landscape Cost Data 2009 - 31 05 16.10 0100 <br />Rip rap - Means Site Work and Landscape Cost Data 2009 - 31 37 13.10 0100 <br />Geotextile Mat - Means Site Work and Landscape Cost Data 2009 - 31 32 19.16 1500 <br />$926.11 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 1311 <br />2916.7 <br />$926.11 4227.7 <br />$310.28 <br />$1,236.39 <br />$3,107.07 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$926.11 <br />$4,761.43 <br />$3,630.17 <br />$3,197.26 <br />$28,204.53 <br />$6,912.48 $6,912.48 <br />$2.37 $10,019.55 $47,631.98 <br />$310.28 <br />$16,550.16 <br />$10,019.55 $64,492.43 <br />$68,168.50 <br />Gravel hauling - Means Site Work and Landscape Cost Data 2009 - 03 05 13.25 0550 <br />Rip rap hauling - Means Site Work and Landscape Cost Data 2007 - 03 05 13.25 1200