My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-24_REVISION - C1980005
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2009-03-24_REVISION - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:43 PM
Creation date
3/25/2009 11:00:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
REVISION
Doc Date
3/24/2009
Doc Name
Reclamation Cost Estimate
From
Susan Burgmaier
To
Dan Mathews
Type & Sequence
SL3
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 078 State : Colorado Permit/job# : C-1981-005 <br />Date : 0311712009 County : Routt Abbreviation :,none <br />User : SLB Site : Seneca li Mine Filename : 0005-078 <br />Agency or organization name: CDMG <br />Permit or other job action :Phase 11 Bond Release Request <br />Task description :Backfill truck wash ponds (SCC Task HYD-1) <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :NA <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $84.86 NA <br />Operating cost/hour : $138.49 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $256.13 Total fleet cost/hour : $256.13 <br />.......... <br />_ _._. ., <br /> <br />MATERIAL QUANTITIES .......... .......... _ <br />Initial Swell Loose <br />volume : 1,300 CCY factor : 1.150 volume : 1,495 LCY <br />Source of estimated volume: Exhibit 7-16 <br />Source of estimated swell factor : Consistent with other SCC tasks <br />HOURLY PRODUCTION Job Condition Correction Fa( <br /> Operator skill <br />Average push distance : 200 feet Material consistency <br />Unadjusted hourly production : 946.0 LCY/hr Dozing method <br /> Visibility <br />Material consistency description : Job efficiency <br />Compacted fill or embankment Spoil pile <br /> Push gradient <br />Average push gradient : 0.00 % (pos) Altitude <br />Average site altitude : 8,000 feet Material weight <br /> Blade type <br />Material weight : 2804 Ibs/LCY Net correction <br />Weight description <br />USER-PROVIDED WEIGHT DATA <br />Source <br />0.75 (avg.) <br />0.90 (Cat HB) <br />1.00 (gen.) <br />1.00 (a vg.) <br />0.83 (1 shift/day) <br />0.40 (user) <br />1.00 (Cat HB) <br />1.00 (Cat HB) <br />0.82 (user) <br />1.00 (S/SU/U) <br />0.18 <br />Adjusted unit production : 173.83 <br />Adjusted fleet production : 173.83 <br />A <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 8.60 <br />LCY/hr <br />LCY/hr <br />Hours <br />Unit cost : $1.473 /LCY Total job cost : $2,203
The URL can be used to link to this page
Your browser does not support the video tag.