My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-24_REVISION - C1980005
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2009-03-24_REVISION - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:43 PM
Creation date
3/25/2009 11:00:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
REVISION
Doc Date
3/24/2009
Doc Name
Reclamation Cost Estimate
From
Susan Burgmaier
To
Dan Mathews
Type & Sequence
SL3
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 007 <br />Date : 0311212009 <br />User: SLB <br />Agency or organization name : CDMG <br />Permit or other job action : SL03 - Phase II Release <br />Task description : Rip facilities area (SCC Task RIPFAC-1) <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :1-shank ripper <br />Cost Breakdown : Ownership cost/hour : <br />Dozer operating cost/hour : <br />Ripper operating cost/hour : <br />Operator cost/hour : <br />Total unit cost/hour : <br />MATERIAL QUANTITIES <br />Horsepower: 570 <br />Shiftbasis : 1 per day <br />Data source : (CRG) <br />Utilization % <br />$97.15 NA <br />$138.49 100 <br />$11.68 100 <br />$32.78 NA <br />$280.09 Total fleet cost/hour : $280.09 <br />Selected estimating method : Seismic <br />Alternate methods - <br />Seismic : 56,630 BCY Load factor : NA Bank volume <br />Area : NA acres Rip depth (ft) : NA Volume <br />Source of estimated quantity: SCC Task RIPFAC-1 <br />Source of estimated load factor :NA <br />m.......... HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity: 3,900 feet/second <br />Unadjusted production : 2,494.40 cu. yds./hour <br />Area : Avg. ripping depth : NA feet/pass <br />Average ripping width : NA feet/pass <br />Average ripping length : NA feet/pass <br />Average dozer speed : NA feet/minute <br />Average maneuver time : NA minutes/pass <br />Production per unit area : NA acres/hour <br />Unadjusted production : NA cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) <br />Unit cost : $0.135 per cu. yd. <br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />State : Colorado <br />County: Routt <br />Site : Seneca li Mine <br />56,630 <br />NA <br />BCY <br />BCY or CCY <br />Unadjusted production <br />per selected method : 2,494.40 cu. yds./hour <br />Site altitude : 7,500 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shif 1day) <br />Net job correction : 0.83 multiplier <br /> <br />Adjusted unit production : 2,070.35 cu. yds./hour <br />Adjusted fleet production : 2,070.35 cu. yds./hour <br /> <br />Total job time <br />Total job cost <br />Permit/job # : C-1980-005 <br />Abbreviation : none <br />Filename :0005-007 <br />27.35 hours <br />$7,661
The URL can be used to link to this page
Your browser does not support the video tag.