My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-03-24_REVISION - C1980005
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980005
>
2009-03-24_REVISION - C1980005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:44:43 PM
Creation date
3/25/2009 11:00:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
REVISION
Doc Date
3/24/2009
Doc Name
Reclamation Cost Estimate
From
Susan Burgmaier
To
Dan Mathews
Type & Sequence
SL3
Email Name
DTM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEMOLITION WORK <br />TASK # 001 Seneca II Mine C-1980-005 March 11, 2009 <br />SL03 - Phase II Release <br />STRUCTURE OR ITEM DESCRIPTION DIMENSIONS DEMOLITION DESCRIPTION QUANTITY UNIT UNIT COST TOTAL COST <br />Diesel tank - remove sludge 10000 gallon Means 02 65 10.30 0320 3 EA $357.00 $1,071.00 <br />Haul diesel tank 10000 gallon Means 02 65 10.30 1029 3 EA $1,160.00 $3,480.00 <br />Barbed wire fencing 20000 LF Means 02 41 13.60 1600 20000 LF $1.18 $23,600.00 <br />Chain link fence 1100 LF Means 02 41 13.60 1700 1100 LF $2.50 $2,750.00 <br />Vehicle Maintenance Shop 140'x 80'x 20' Means 02 41 16.13 0020 224000 CF $0.23 $51,520.00 <br />-floor 140' x 80' x 6" Means 02 41 16.17 0280 11200 SF $3.92 $43,904.00 <br />- foundation 440 LF Means 02 41 16.17 1000 440 LF $10.39 $4,571.60 <br />Parts Building 110' x 70'x 20' Means 02 41 16.13 0020 154000 CF $0.23 $35,420.00 <br />-floor 110' x 70'x 4" Means 02 41 16.17 0280 7700 SF $3.13 $24,101.00 <br />Electrical Parts Building 30'x 22' x 10' Means 02 41 16.13 0020 6600 CF $0.23 $1,518.00 <br />-floor 30' x 22' x 4" Means 02 41 16.17 0280 660 SF $3.13 $2,065.80 <br />Lean-to Building 10'x 12'x 10' Means 02 41 16.13 0020 12240 CF $0.23 $2,815.20 <br />Office Building 60' x 50'x 10' Means 02 41 16.13 0020 30000 CF $0.23 $6,900.00 <br />-floor 60' x 50' Means 02 41 16.17 0280 3000 SF $3.13 $9,390.00 <br />Engineering Trailer 55'x 10'x 10' Means 02 41 16.13 0020 5500 CF $0.23 $1,265.00 <br />-floor 55'x 10' Means 02 41 16.17 0280 550 SF $3.13 $1,721.50 <br />Welding Shop 90' x 56' x 15' Means 02 41 16.13 0020 75600 CF $0.23 $17,388.00 <br />-floor 90' x 56' Means 02 41 16.17 0280 5040 SF $3.13 $15,775.20 <br />- foundation 292 LF Means 02 41 16.17 1000 292 LF $10.39 $3,033.88 <br />PM Shop 120'x 42'x 15' Means 02 41 16.13 0020 75600 CF $0.23 $17,388.00 <br />-floor 120'x 42' Means 02 41 16.17 0280 5040 SF $3.13 $15,775.20 <br />- foundation 324 LF Means 02 41 16-171000 324 LF $10.39 $3,366.36 <br />Lube Storage 44'x 18'x 10' Means 02 41 16.13 0020 7920 CF $0.23 $1,821.60 <br />- floor 44'x 18' Means 02 41 16.17 0280 792 SF $3.13 $2,478.96 <br />Magazines/Trailers NA Means 02 41 16.13 0020 1000 CF $0.23 $230.00 <br />Bath House 42'x 40'x 10' Means 02 41 16.13 0020 16800 CF $0.23 $3,864.00 <br />-floor 42' x 40' Means 02 41 16.17 0280 1680 SF $3.13 $5,258.40 <br />Gutting Office Buildings 60' x 50' Means 02 41 19.21 1000 4440 SF $4.46 $19,802.40 <br />Substation Slabs 12'x 30' Means 02 41 16.17 0280 1080 SF $3.13 $3,380.40 <br />Gas Tank 8'x 16' Means 02 41 16.13 0020 800 CF $0.23 $184.00 <br />Silos and Explosives Magazines NA Means 02 41 16.13 0020 30000 CF $0.23 $6,900.00 <br />Powerlines 5 miles Division data 26400 LF $2.62 $69,168.00 <br />Office Trailer Addition 24'x 60'x 11' Means 02 41 16.13 0020 15840 CF $0.23 $3,643.20 <br />-floor 24' x 60' Means 02 41 16.17 0280 1440 SF $3.13 $4,507.20 <br />- footings 84 LF Means 02 41 16.17 1000 84 LF $10.39 $872.76 <br />Wadge Impoundment pumping facility NA Crane/Laborer 8 hrs $121.72 $973.76 <br />Flumes, weather monitoring station NA Backhoe/Laborer 8 hrs $73.47 $587.76 <br />Hazardous Waste testing and disposal 10 drums max Means 02 65 10 1100 10 EA $239.60 $2,396.00 <br />- transportation to disposal site 50 miles Means 02 65 10 1260 50 Miles $3.72 $186.00 <br />Culvert Al 24" x 30' Means 02 41 13.40 0170 30 LF $9.03 $270.90 <br />excavation/backfill of culvert Division estimate 30 LF $0.25 $7.50 <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.