Laserfiche WebLink
Topsoiling, discing seeding and mulching is needed in Mining Area 1 (4.56 acres), Mining Area <br />8 (4.81 acres), Mining Area 4 (4.61 acres), Mining Area 5 (4.14 acres) and the mining haul road <br />(1.36 acres). The total area is 19.48 acres. The topsoil will be replaced to a thickness of 12 inches <br />and will result in a volume of 31,428 cy. This topsoil will come from the topsoil stockpiles <br />shown on Map C-2. <br />Simmons Pit, March 2009 L-2