Laserfiche WebLink
would not have been comparable to previously obtained samples. No issues have been <br />encountered with respect to the analytical results. <br /> D2B D2B2 <br />Date H TSS H TSS <br />December 31, 2008 8.69 38 mg/l Not available Not available <br />December 31, 2007 8.72 17 mg/1 8.49 14 mg/I <br />June 13, 2006 8.58 12 mg/1 8.15 39 mg/1 <br />June 6, 2005 8.57 10 mg/1 NA NA <br />December 28, 2004 8.53 6 mg/1 NA NA <br />SC-1 Well - Rollins Sandstone <br />Monitor well SC-1 is located just east of the reclaimed Sanborn Creek mine portal area. <br />Well SC-1 was completed in the Rollins Sandstone, which is located 40 to 50 feet below the 13- <br />Seam. Monitoring data were historically collected from well SC-1 prior to any substantial <br />mining in the B-Seam of the Sanborn Creek Mine. The SC-1 well is located up-gradient relative <br />to the Rollins Sandstone unit which is located stratigraphically under the footprint of the mining <br />activities. <br />• Water in the Rollins Sandstone is confined to limited localized zones that are fractured and/or <br />contained above the Rollins, as evidenced by water level measurements that are well above the <br />top of the sandstone member. Water quality is poor, with high total dissolved solids as sodium <br />chloride. Inflow and recovery of the water level in the drill holes indicates very low <br />permeability and porosity of the sandstone. There has been some variability in the water levels <br />measured in well SC-1 but there has been no apparent trend or indication of impact. No <br />significant difference in the 2008 monitoring results from baseline or historical measurements <br />was noted in well SC-1. <br />The limited water quantity and poor water quality suggests there is limited transmissivity <br />between the North Fork of the Gunnison River alluvium through the Rollins sandstone down- <br />gradient towards the area associated with the Sanborn Creek Mine. <br />SC-3 Well - B-Seam Coal - Sanborn Creek Mine <br />Monitor well SC-3 is located east of the Sanborn Creek reclaimed mine portal area along the <br />entrance to the pre-existing ranch road to Coal Gulch. <br />Monitoring well SC-3 was completed into the B Seam coal. Monitoring data were collected <br />from well SC-3 prior to any substantial mining in the B-Seam of the Sanborn Creek Mine. The <br />SC-3 well is up-gradient relative to the B seam underground mining activities but down-gradient <br />from the North Fork of the Gunnison River <br />. The plastic pipe casing is squeezed at the 20 foot level making it difficult to lower a bailer. <br />Using a smaller diameter bailer we have found very minimal water available in the well. In fact <br />there are times when the initial bailing of the well to remove one volume effectively drains the <br />15